Material Requirements
Overview¶
Puls8 Replan allows planners to see how much Raw Material Requirements they need to satisfy a plan
Setup¶
To incorporate raw material in a plan, you need to include inputs into production methods. Below shows an example of ingredients being used as inputs to create BEEF LARGE SINGLE in the production methods.
Where a planner wants to see how much material to order for a plan, you run the plan without the Required Materials constraint.
Output¶
Below is a plan where there isn't enough raw materials for the plan. The shortage graph shows how much of a raw material needs to be ordered per period to meet the plan. The Solution download gives the planner the same information in tabular format.